List of works:
  • Visual inspection of all electrical equipment, receiving and processing initial data
  • Short-circuit analysis
  • Generation/consumption balancing study for current and perspective demand
  • Dynamic stability analysis
  • Steady-state analysis (verification of N and N-1 criteria, checking for branches overloads and voltages violations)
  • Proposals for reinforcements and reconstruction of the grid
  • Economic assessment
> 30
number of projects
~$4,5 m
total amount
Some of the projects
Power output scheme of energy source located in Bilibino (2017)

External power supply of 6 kV and 35 kV consumers located near ES-2 Centralnaya TPP of "Nevskiy" branch of PJSC "TGK-1" with decommissioning of ES-2 Centralnya TPP generation units (2019)

Primorskaya TPP output scheme for electric grids of "Yantarenergo". Construction of incoming lines (2020)

Power plant power output schemes for connection of additional power to energy system of SC "LOTEK" (2020)

Power plant power output schemes for connection of 24.9 MW TPP of Kirovskiy zavod to energy system (2020)

Clarification of Leningradskaya NPP-2 power output scheme. NPP units №1 and №2.

Electric grid facilities for connection of Beloporozhskaya HEP-1 and Beloporozhskaya HEP-2 to "FSK EES" network. Karelia Republic, Kemsky region.

Construction center for large-capacity off-shore structures of PJSC NOVATEK. External power supply

Power supply of tourist complex "Valla-Tunturi"

Amur TPP with 540 MW total capacity. Installation of the third transformer of minimum 60 MVA capacity.