Engineering and design work for the facility: "Reconstruction of 6 kV CLs Pravoberezhny RPS (ph. 5-12, ph. 5-29, ph. 5-36, ph. 5-19), 17.4 km long
Construction of 10 kV CLs 11.6 km, 10 kV CLs 14.8 km. For technological connection of power receiving devices of the applicant JSC "SEZ St. Petersburg" at the address St. Petersburg, on the territory of SEZ HTP, site "Novoorlovskaya", plot 2,4
Construction of a 10/0.4 kV transformer substation with a capacity of 19.2 MVA, 10 kV CL with a length of 4.6 km for technological connection of power receiving devices
Construction of 10/0,4 kV BKTP, with a capacity of 6,4 MVA, CL-10 kV 3,6 km long for technological connection of power receiving devices
Design and installation work: Construction of two 10 kV transformer substations and 38 km of 10 kV CLs with installation of 18 MVA transformers for technological connection of power receiving devices
Construction of a 10/0.4 transformer substation with a capacity of 9.6 MVA, 10 kV CL with a length of 1.4 km for technological connection of power receiving devices of the applicant Setl Invest LLC at the address: St. Petersburg, Oktyabrskaya embankment (2nd stage)
Design and installation work: Reconstruction of 10 kV cells at the 110 kV Nissan substation (substation 99) for the technological connection of power receiving devices
Design and engineering works for the facility: Construction of 10 kV switchgear and 10 kV CL with the length of 16.8 km for technological connection of power receiving devices of the applicant, Hyundai Via Rus LLC, at the address: St. Petersburg, Sestroretsk, Levashovskoe highway, cadastral number 78:36:0013415:196
Construction of a 6.4 MVA 10/0.4 kV transformer substation, 3 km of 10 kV CLs and 5.4 km of 0.4 kV CLs for the grid connection of power receiving devices
Construction of 10/0,4 kV BKTP with a capacity of 5.7 MVA, 1.8 km of 10 kV CLs, 6.0 km of 0.4 kV CLs for the connection of power receiving devices