A framework agreement for the performance of a full range of design and survey works at power grid facilities for the purpose of technological connection of applicants' power receiving devices, reconstruction and modernization of existing networks within the framework of reliable power supply, as well as the release of land plots from utility networks for all branches of PJSC Lenenergo in the territory of St. Petersburg and the Leningrad Region (PJSC Rosseti Lenenergo)
Design and survey work on the object: "St. Mary Magdalene Children's City Hospital No. 2" at: 1st line V.O., 58 for the placement of medical and diagnostic departments, including the development of project documentation for the RD stage" (LLC IC "Vysotspetsstroy")
Execution of engineering surveys on the project "Overhaul of the support part of the overpass of 10 kV RP-110 supply cable lines" in Norilsk.
Comprehensive engineering surveys for a capital construction facility: JSC Kola MMC. Evaporation plant.
Creation of a topographic terrain plan for the implementation of the project "Park "Three Volcanoes" (LLC "Park "Three Volcanoes")
Comprehensive engineering surveys for the object "Installation of additional GPA at the KS "Pikalevskaya" (LLC "Gazprom Design")
Pre-project survey with the preparation of a report and the development of a design assignment for the object: "Execution of design and survey work, development of design and working documentation for the technical re-equipment of electrical equipment for the needs of Novocherkassk GRES" (LLC "RES")